单车之家-BikeHome.net
标题: 在家靠父母,在外靠朋友!版主请保留5天,工作与困难请英文高手帮助 [打印本页]
作者: yankeyu 时间: 2006-10-24 15:41
标题: 在家靠父母,在外靠朋友!版主请保留5天,工作与困难请英文高手帮助
1) Roles of Crisis Team - Immediately following a major fire incident, the Managing Director will activate the Crisis Team to lead and coordinate the efforts:
危機小組的作用-在重大火災后,相關人員會派出危機小組來帶領以及監管下工作
a) To assess the impact of the incident so as to define the degree, areas, facilities and workforce of damages.
對時間的影響,地點,設施以及損壞進行考察
b) To bring the immediate situation under control so as limit the effect e.g. intact facilities will not be affected by subsequent actions etc…
立刻控制局面並減少影響,例如確保事件后的任何動作都將不會影響到設施等等
c) To implement immediate actions to minimise effects.
立刻採取行動以降低其影響程度
d) To implement medium and long term action plans to restore the services and operations e.g. relocate all facilities in new building, purchase of equipment, etc…
執行中長期的行動計劃,重新讓其運轉,例如將設施移動到新的地點並採購新器材等等
e) To monitor the process and adjust the action plan.
監控,進行並改善行動計劃
e) MIS
i) Carry out damage assessment.
提供損壞報告
ii) Resuming and implementation MIS systems (e.g. internet, computer networks & infrastructure (e.g. telephone etc…)
重新設置MIS系統(例 網絡,電腦連接以及基礎設施 如 電話
f) Safety
安全部門/人員
i) Coordinator for communication with legal department (e.g. safety licenses etc…).
與合法機構的聯係人員(例:安全執照等)
ii) Assist Operation and Quality member to carry out damage assessment.
幫助操作及質量管理部門人員製作損失報告
g) Coordination
協商
i) Maintain an updated disaster recovery plan of STR-SH.
對STR-SH的損失重建計劃進行保養以及升級
ii) Arrange regular meeting of management committee members.
與管理委員會人員安排會談
iii) Arrange regular meeting with relevant departments in STR-SH or other STR AP locations.
安排STR-SH或其他STR AP地點的内部會議
iv) Collaborate with other AP locations in order to build an AP DR system.
與AP部門合作以建立AP DR系統
v) Assist the Chairman to arrange emergency meeting in crisis conditions.
協助主席召開緊急會議
vi) Prepare agenda and minutes.
準備公司日程表
h) Deputy of the Member - Deputy will take up the roles and responsibilities of the member in case of his absence. Deputies or other personnel from inside or outside STR-SH may be requested to join the team or meeting according to need.
部門帶表將會接管任何未到員工的責任.STR-SH或其他代表將可能視情況而被要求參加會議
2) Responsibility of Team Members - The prime responsibilities is defined as below. These may need amendment dependent on personnel availability.
隊員的職責,主要的責任將在以下解釋. 可能因個人的原因而有所不同
a) Chairman - Public media director and coordinator for STR resources.
主席-STR的公開發言人,指導者以及聯係人
b) F & A
i) Coordinator for communication with statutory authorities, insurance, finance and STR employees.
ii) Procurement of office equipment.
F&A-STR對政府機構,保險,財政以及STR員工的聯係人員,以及採購辦公用品
c) Sales
i) Customer Care and media information (with prior approval by Chairman) coordination.
ii) Set up a Temporary Help Desk for one week as a nominated telephone station to answer general enquiries from customers and media
銷售-客戶服務以及訊息管理(需經過主席批准)
-設立臨時聯絡中心來對客戶以及媒體的提問進行回答
d) Operation & Quality
i) Coordinator for employee contact/support.
ii) Coordinator for planning/implementation of emergency testing programs & infrastructure.
iii) Laboratory and customer service systems.
iv) Coordinator for procurement of replacement laboratory equipment.
運作及質量管理部門 - 管理工作人員的聯係以及支持
-進行緊急測試以及組織進行策劃及實施
-實驗室以及消費者服務設施
-對實驗室設施進行採購
作者: yankeyu 时间: 2006-10-24 15:42
3) Incident Control & Evaluation - Immediately following an incident members of operation & quality, safety and MIS will assess and report on the damage to the Crisis Team. The crisis team will support and advise emergency services and local municipal units in handling the immediate situation and provide information required about materials and activities of STR-SH.
事件控制和价值评估-在接下来的事件操作和质量,安全和管理信息系统,都会对危机队的损坏进行报告和评估。危机队将维持并建议紧急事件服务商和地区市政单位来着手处理紧急状况并提供有关STR-SH放射及材料所必须的信息。
a) Based on the assessment, the team may hire contractors to fix damages that may cause another incident e.g. damage of fuel tank, broken windows, bending of water pipe etc…
基于估价金额,组织可能出钱雇人来修理会引起其他事故发生的毁坏处,包括燃料桶的损坏,窗户的破裂,水管的弯曲等…
b) According to the findings of the assessment, the crisis team can determine immediate actions and do analysis for making up a solid recovery plan.
对评估的研究结果达成协议, 危机队能确定直接的行动并为一个坚固的恢复计划做分析。
4) Damage Assessment - Following the incident, and concurrent with the investigation as to the cause, an assessment will be made
损伤估价-在事件或者是在调查研究中引起的同时间事件发生后,应该做一个评估金额。
a) To get information of building safety and availability of building infrastructures e.g. electricity, gas, water, lift, telephone, internet, fire safety system and devices etc…
要得到大厦安全和大厦基础设施即电、气体、水、电梯、电话、互联网、防火安全系统和设备的信息及实用性等...
b) To determine floor safety and areas (office, storage room etc…) of damage inside STR units in different floors.
确定地板安全和在STR 单位里面 (办公室, 贮藏室等区域..) 损伤程度不同的地板。
c) To determine number of casualties and the extent of injuries (loss of workforce in short and long periods).
确定人员伤亡的人数和受损范围(包括短期和长期的劳动力损失)
d) To identify internal installations (e.g. computer network, lighting, electricity, compressed air etc…) & operation equipment (e.g. test equipment, office equipment, storage tanks and supply) affected. (refer to Cecas system)
鉴别内部受到影响的装备(例如计算机网络,照明设备,电器,压缩空气等)和操作设备(例如测试设备,办公设备,贮藏冠及供应品)。(参照非洲经济委员会制度)
e) To determine the degree of damage of installation & equipment so as to classify them into repair or replacement groups).
确定设施装置的受损程度以便分类他们入修理或替换的小组) 。
5) Damage Analysis - With the data from the assessment, the crisis team can do analysis to quantify the following effects:-
a) Testing & inspection capability e.g. number of test delayed per day etc..
b) Customer service e.g. number of order or calls missed etc…
c) Employee Loss.
d) Public image of STR-SH e.g. how many % customer will not use STR-SH.
e) Financial Loss.
作者: yankeyu 时间: 2006-10-24 15:42
6) Immediate Actions
Chairman - Inform STRUS about the incident.
- Call for meetings.
F & A Inform Insurance agency
Sales Prepare announcement for customers
Operation & Quality - Carry out damage assessment.
- Attend welfare needs of any casualties & their families.
MIS Carry out assessment on MIS system
Safety Carry out assessment on safety system
Coordination Assist Chairman to arrange meetings and communication channels to other units (internal or external).
7) Recovery Plans - In establishing recovery plans, there are 4 possible scenarios from a major fire disaster:-
a) Total Loss of Office, Laboratories and Storage - This would be a total loss scenario in which local service & operations would not be viable for a significant time period (more than six months).
i) Chairman: A meeting will be held in the temporary office (e.g. local hotel) Regular public announcement should be made to keep the STR image.
ii) F & A: Figures of setting up temporary operations and total resuming should be estimated. Quick financial supports provided by insurance company and STRUS should be opened. Welfare needs of employees should be taken care by close contact. Purchases of office equipment are carried out for the new permanent STR-SH location.
iii) Inspection: Currently, most of inspection order is performed by China inspectors so STR-SH should setup a temporary coordination & customer services in another building or other offices in Shanghai that can provide communication facilities.
iv) Testing: Due to total damage of laboratory equipment, no test operation can be resumed in short time. Samples can be subcontracted to other local laboratories or our sister laboratory in Shenzhen. A temporary coordination and customer services office should be set up in another building or other offices in Shanghai that can provide communication facilities. (CNAS accredited laboratory web link http://www.cnas.org.cn)
v) Sample Delivery Services: Sample courier service should be switched to TNT headquarters in order to maintain samples collection & delivery services between customers and other laboratories.
vi) MIS: Remote backup data, programs and documents should be reinstalled in temporary offices so as to resume inquiry, order receiving, communication, result reporting & result posting services etc…
vii) Sales: To assist Chairman to prepare updated announcements. Sales and marketing personnel should contact the affected customers for providing immediate info and helps e.g. resubmission of samples, rescheduling of inspection or delay of test results. For other customers, sales department should keep an efficient channel for them to place inquiry and order. To maintain a Help Desk and a Temporary Contact List of Operation. (see appendix 03 for the announcement template)
viii) Quality: QA should monitor the temporary operations and resuming works so as to maintain the quality requirements of STR quality system. Purchases of new laboratory equipment are carried for the new permanent STR-SH location. Current original certifications e.g. business registration, CNAS, clients’ certificates, safety license and certificate etc… can be replaced by sending requests to the providers. (See appendix 04)
ix) Storage: Temporary storage areas should be setup in the same building or other nearby buildings.
x) Drills and tests should be arranged regularly or after critical changes or updates.
b) Loss of Laboratory – Follow the relevant clauses in section 10)a).
c) Loss of Storage - Old samples, old test paper records, old account / financial paper records are lost. Critical contents may be retrieved by contacting the original holders or other copy holders.
d) Partial Loss of Office, Laboratory and Storage
i) The impact of a partial loss of either facility is the most likely event and it may be harder than total loss for management since we have to take care of the partial operation and re-build in the same time.
ii) Repair & replacement of installation, equipment, and infrastructure can follow the relevant clauses in section 10)a).
作者: yankeyu 时间: 2006-10-24 15:44
8) Important Recovery Task
重要的重建任务
a) Setting up a new location
寻找新的场所
i) Office / Laboratory / Storage
办公室/实验室(工厂)/仓库
In Pudong district, new locations suitable to our needs should be found by using a
local property agency (see appendix 05). If a single location with area up to 4,000 sq. meter is hard to find, other district should be considered. For temporary purposes, separate locations can be accepted.
在浦东,寻找新的办公场所应该交由房产代理(?)来做(见附录5)。如果4000平米以上的单一场所难以找到,应该考虑其他的地方。作为临时使用,分开办公应当被接受。
ii) The infrastructure of the new locations must be assessed to meet our special needs e.g. laboratory need special arrangement for air exhaustion and waste water drainage etc…
新场所的基础设施应当满足我们的特殊需求,例如:实验室需要特殊的通风设备和污水处理设备
iii) Decoration and installation time of different operation units are quite different, so a project management team should be formed to oversee the process.
不同的施工单位所花的装修事件差异相当大,因此应当成立一个项目管理小组来监督装修进度
iv) The estimated time of setup new locations (including installation of old equipment) for different functions are shown below. It is assumed that location design and old equipment are ready for installation
对不同的科室所使用的新场所的评估时间表(包含旧仪器的安装)如下。这个表假定装修已经完毕并且仪器也已经安装到位
作者: yankeyu 时间: 2006-10-24 15:44
Item Unit Time
编号 单位 事件
1 Office Four weeks
办公室 4周
2 Textile Laboratory Six weeks
纺织品实验室 6周
3 Chemical Laboratory Ten weeks
化学实验室 10周
4 Toy Laboratory Six weeks
玩具实验室 6周
5 Condition Room Ten weeks
控制室 10周
6 Furniture Laboratory Six weeks
家具实验室 6周
7 Electrical Laboratory Six weeks
电器实验室 6周
8 Flammability Laboratory Ten weeks
可燃物实验室 (?) 10周
9 Storage Area Three weeks
仓库 3周
作者: yankeyu 时间: 2006-10-24 15:45
v) In Shanghai, change of business registration address, registration of other public services like electricity, water, telephone fire and renewal of insurance can be approved within four weeks.
在上海,商业注册地址改变以及水电、电话、火警、保险等公共服务改变将会在在4周内收到政府答复。
b) Infrastructure - Temporary and permanent replacement actions are summarised in the table below.
基础设施——临时或者永久办公地址的基础设施要求如下
作者: yankeyu 时间: 2006-10-24 15:48
Re:在家靠父母,在外靠朋友!版主请保留5天,工作与困难请英文高手帮助
-
1-1.jpg
(48 KB, 下载次数: 11)
-
1.jpg
(124 KB, 下载次数: 10)
-
1.jpg
(109 KB, 下载次数: 9)
作者: yankeyu 时间: 2006-10-24 15:48
c) Equipment
i. Most of the equipment are imported and consequently involve a long lead time for delivery. Some such as the GC-MS, UV-VIS equipment are available in 1-1.5 months; light fastness tester requires 6 months but most others are 2-3 months. 2nd hand or refurbished equipment can be considered.
ii. For CNAS accreditation, a period of 4-6 weeks records of stabilisation in the conditioning room would be needed before an audit. The lead time for requesting a visit is about 10-12 weeks.
iii. Overall, it is estimated that to establish a new operational location would require a good project manager and take 6 months.
iv. A full list of equipment can be found in Cecas system.
d) Personnel
i) A departmental contact list of all department heads & his deputies are maintained by F & A.
ii) Department head and his deputy should keep a contact list of their staff.
e) Data, Software and Application - In order to protect MIS system and enable a rapid restart of operation, back-up copies of the following data, functions and applications (software) are maintained in Data Centre.
i) All e-mail communications go through Data Centre
ii) Setup all web-mail accounts for all necessary users
iii) Setup VPN accounts for all necessary users
iv) Re-direct all applications to Data Centre
v) Re-direct company’s web site to Data Centre
f) Documentation - Controlled copies of this document will be held by the personnel in the crisis team including their deputy. A copy will be kept by STRUS (Chairman of Disaster Recovery Team).
i) Additions and amendments to this manual will be made as required to ensure that the information is kept up-to-date.
ii) DR Coordinator is responsible for the maintenance so all members of the crisis team have a current copy on hand.
作者: yankeyu 时间: 2006-10-24 15:49
翻译成中文就好了,只要意思对就好了!!!!
作者: yankeyu 时间: 2006-10-24 15:53
能翻多少是多少!!!在这里先谢谢大家了!!!
作者: vitamind 时间: 2006-10-24 18:06
你太强了,晚上联系个朋友问问看!
作者: yankeyu 时间: 2006-10-24 21:37
ding
ding
ding
作者: yankeyu 时间: 2006-10-24 21:51
一定要救救我啊11!!!!如果本周不翻好,11月4日就出不来了
兄弟们可怜可怜我吧!!!!
作者: 阿军 时间: 2006-10-24 21:52
好像是应急事件处理的东西,太专业了,翻译有点难度...
楼主可以联系atp,他正在英国的,我有时间的话可以帮楼主翻译一点
不过水平比较菜
作者: mauricze 时间: 2006-10-24 21:52
没仔细看,好像是工作手册嘛?是有机化学实验室?
作者: yankeyu 时间: 2006-10-24 21:55
众人出力火焰高!!!!!谢谢兄弟们的抬举
!!!!!!!
作者: calvinsonic 时间: 2006-10-24 22:20
1) Roles of Crisis Team - Immediately following a major fire incident, the Managing Director will activate the Crisis Team to lead and coordinate the efforts:
危機小組的作用-在重大火災后,相關人員會派出危機小組來帶領以及監管下工作
a) To assess the impact of the incident so as to define the degree, areas, facilities and workforce of damages.
對時間的影響,地點,設施以及損壞進行考察
b) To bring the immediate situation under control so as limit the effect e.g. intact facilities will not be affected by subsequent actions etc…
立刻控制局面並減少影響,例如確保事件后的任何動作都將不會影響到設施等等
c) To implement immediate actions to minimise effects.
立刻採取行動以降低其影響程度
d) To implement medium and long term action plans to restore the services and operations e.g. relocate all facilities in new building, purchase of equipment, etc…
執行中長期的行動計劃,重新讓其運轉,例如將設施移動到新的地點並採購新器材等等
e) To monitor the process and adjust the action plan.
監控,進行並改善行動計劃
作者: calvinsonic 时间: 2006-10-24 22:38
2) Responsibility of Team Members - The prime responsibilities is defined as below. These may need amendment dependent on personnel availability.
隊員的職責,主要的責任將在以下解釋. 可能因個人的原因而有所不同
a) Chairman - Public media director and coordinator for STR resources.
主席-STR的公開發言人,指導者以及聯係人
b) F & A
i) Coordinator for communication with statutory authorities, insurance, finance and STR employees.
ii) Procurement of office equipment.
F&A-STR對政府機構,保險,財政以及STR員工的聯係人員,以及採購辦公用品
c) Sales
i) Customer Care and media information (with prior approval by Chairman) coordination.
ii) Set up a Temporary Help Desk for one week as a nominated telephone station to answer general enquiries from customers and media
銷售-客戶服務以及訊息管理(需經過主席批准)
-設立臨時聯絡中心來對客戶以及媒體的提問進行回答
d) Operation & Quality
i) Coordinator for employee contact/support.
ii) Coordinator for planning/implementation of emergency testing programs & infrastructure.
iii) Laboratory and customer service systems.
iv) Coordinator for procurement of replacement laboratory equipment.
運作及質量管理部門 - 管理工作人員的聯係以及支持
-進行緊急測試以及組織進行策劃及實施
-實驗室以及消費者服務設施
-對實驗室設施進行採購
作者: 阿军 时间: 2006-10-24 22:51
随便选了点翻译,貌似楼主在瑞士通标...好大的实验室项目,有错误请指正
8) Important Recovery Task
重要的重建任务
a) Setting up a new location
寻找新的场所
i) Office / Laboratory / Storage
办公室/实验室(工厂)/仓库
In Pudong district, new locations suitable to our needs should be found by using a
local property agency (see appendix 05). If a single location with area up to 4,000 sq. meter is hard to find, other district should be considered. For temporary purposes, separate locations can be accepted.
在浦东,寻找新的办公场所应该交由房产代理(?)来做(见附录5)。如果4000平米以上的单一场所难以找到,应该考虑其他的地方。作为临时使用,分开办公应当被接受。
ii) The infrastructure of the new locations must be assessed to meet our special needs e.g. laboratory need special arrangement for air exhaustion and waste water drainage etc…
新场所的基础设施应当满足我们的特殊需求,例如:实验室需要特殊的通风设备和污水处理设备
iii) Decoration and installation time of different operation units are quite different, so a project management team should be formed to oversee the process.
不同的施工单位所花的装修事件差异相当大,因此应当成立一个项目管理小组来监督装修进度
iv) The estimated time of setup new locations (including installation of old equipment) for different functions are shown below. It is assumed that location design and old equipment are ready for installation
对不同的科室所使用的新场所的评估时间表(包含旧仪器的安装)如下。这个表假定装修已经完毕并且仪器也已经安装到位
Item Unit Time
编号 单位 事件
1 Office Four weeks
办公室 4周
2 Textile Laboratory Six weeks
纺织品实验室 6周
3 Chemical Laboratory Ten weeks
化学实验室 10周
4 Toy Laboratory Six weeks
玩具实验室 6周
5 Condition Room Ten weeks
控制室 10周
6 Furniture Laboratory Six weeks
家具实验室 6周
7 Electrical Laboratory Six weeks
电器实验室 6周
8 Flammability Laboratory Ten weeks
可燃物实验室 (?) 10周
9 Storage Area Three weeks
仓库 3周
作者: calvinsonic 时间: 2006-10-24 22:53
e) MIS
i) Carry out damage assessment.
提供損壞報告
ii) Resuming and implementation MIS systems (e.g. internet, computer networks & infrastructure (e.g. telephone etc…)
重新設置MIS系統(例 網絡,電腦連接以及基礎設施 如 電話
f) Safety
安全部門/人員
i) Coordinator for communication with legal department (e.g. safety licenses etc…).
與合法機構的聯係人員(例:安全執照等)
ii) Assist Operation and Quality member to carry out damage assessment.
幫助操作及質量管理部門人員製作損失報告
g) Coordination
協商
i) Maintain an updated disaster recovery plan of STR-SH.
對STR-SH的損失重建計劃進行保養以及升級
ii) Arrange regular meeting of management committee members.
與管理委員會人員安排會談
iii) Arrange regular meeting with relevant departments in STR-SH or other STR AP locations.
安排STR-SH或其他STR AP地點的内部會議
iv) Collaborate with other AP locations in order to build an AP DR system.
與AP部門合作以建立AP DR系統
v) Assist the Chairman to arrange emergency meeting in crisis conditions.
協助主席召開緊急會議
vi) Prepare agenda and minutes.
準備公司日程表
h) Deputy of the Member - Deputy will take up the roles and responsibilities of the member in case of his absence. Deputies or other personnel from inside or outside STR-SH may be requested to join the team or meeting according to need.
部門帶表將會接管任何未到員工的責任.STR-SH或其他代表將可能視情況而被要求參加會議
作者: yankeyu 时间: 2006-10-25 09:27
x谢谢大家了,
再接再厉啊!!!
作者: 夏天草莓 时间: 2006-10-25 09:31
还是好人多 
作者: yankeyu 时间: 2006-10-25 16:56
ding
ding
ding
ding
ding
ding
作者: 阿军 时间: 2006-10-25 19:00
v) In Shanghai, change of business registration address, registration of other public services like electricity, water, telephone fire and renewal of insurance can be approved within four weeks.
在上海,商业注册地址改变以及水电、电话、火警、保险等公共服务改变将会在在4周内收到政府答复。
b) Infrastructure - Temporary and permanent replacement actions are summarised in the table below.
基础设施——临时或者永久办公地址的基础设施要求如下

项目 需求 备用和中断保护
电 1、3相供电 a)新场所必须有足够的备用发电机
2、电压达到380v b)如果主线路和备用电源短期内不能满足需求
最好把仪器安装到另外的场所来为客户提供服务
3、电流达到400A c)如果城市供电系统和备用发电机同时损坏,
最好的方法是把转包合同和服务移到深圳胜邦。
深圳胜邦可以使用他们的仪器为客户提供服务。
水
需要3种级别的水
1:实验室需要符合 不同级别的水在上海都可以每日订购
iso标准的三蒸水
2:饮用水
3:自来水
吃饭去了,每一一译

作者: yankeyu 时间: 2006-10-25 19:15
世上还是好人多啊!!!!!
作者: yankeyu 时间: 2006-10-25 20:58
ding
ding
ding
ding
作者: temboard 时间: 2006-10-26 03:26
managing Director 董事經理
Legal Department 法務部門
v) Assist the Chairman to arrange emergency meeting in crisis conditions.
協助主席在重大情況下召開緊急會議
vi) Prepare agenda and minutes.
準備行程表與重點提示
Meeting Minutes 也可解釋為會議紀錄或是會議備忘錄
作者: temboard 时间: 2006-10-26 03:29
抱歉,說明一下
董事經理 是特指為公司最高經營者(通常是總經理)但是同時也是董事會成員之一,有一些公司也稱為常務執行董事或是執行董事但是不一定是公司的最高行政主管
作者: yankeyu 时间: 2006-10-26 08:56
引用第27楼temboard于2006-10-26 03:29发表的“”: 抱歉,說明一下董事經理 是特指為公司最高經營者(通常是總經理)但是同時也是董事會成員之一,有一些公司也稱為常務執行董事或是執行董事但是不一定是公司的最高行政主管
太专业了!
作者: yankeyu 时间: 2006-10-26 11:57
引用第29楼小优于2006-10-26 08:58发表的“”: KAO 找个翻译公司不就结了,你们公司也太会省钱了。。。。。。。。这什么公司呀。。。。。
最近自己的工作就需要翻一大堆的资料,如果您不着急, 我下周看看能能安排点时间出来。。。。8好意思哟。。。。 
能否帮我把6楼的第二张图片看看?
作者: yankeyu 时间: 2006-10-26 13:33
dieng dingding
作者: 阿军 时间: 2006-10-26 19:52
引用第30楼yankeyu于2006-10-26 11:57发表的“”: 能否帮我把6楼的第二张图片看看?
我帮你翻译了一下,每日一译,不好意思上次有个地方翻译错了,condition room 应该是空调室比较合适。终于学会插入表格了
还没吃饭那

项目 | 需求 | 备用方案 | 制热/制冷设备 | 大部分办公区域使用普通空调就可以 | 临时的制热/制冷设备使普通办公区域保持在合适的温度来提供比较好的办公条件(20-28℃) | 需要控制空气的实验室的空调设备 | 样品和测试空调实验室需要特殊的空调设备来保证合适的温度和湿度控制。现在有6台专用空调供3个实验室使用(每个房间2个轮流运转) | a) 如果一个空调损坏了,另外一个空调可以立即使用来维持实验条件,同时损坏的空调应当立即维修以防止两台空调同时损坏 b) 如果两台特殊空调同时损坏,新的空调只能在3个月之内到达,在这段时间里,我们应当使用合适的设备进行条件控制(制冷机器、制热机器、除湿设备、加湿设备),在这种情况下,密切监测实验条件是必须的。 c) 合适的制热制冷加湿除湿设备在当地市场可以短时间内买到 | 空气压缩设备 | a) 大容量的空气压缩机和仓储设备是Hardlines Department的大型测试实验必须的 b) 一些小型设备可供其他小型实验使用。 | a) 大型空气压缩机和仓储设备可以在2个月之内完成安装调试 b) Hardline的测试实验需要的小型设备可以在2到3天内买到,但是需要注意安装的空间布局。 | 计算机网络 | 组建局域网来做备份处理,同时还需要国内国际互联网服务和邮件服务器 | a) 实验室和办公室基础设施装修完成后局域网必须安装完毕 b) 如果服务器和计算机到位,无线网络可以完成大部分的恢复工作 | 计算机、服务器和软件 | 上海胜邦大概使用270台pc和15台服务器 | a) 完成所有的计算机和服务器安装大概需要5个工作日 b) 上海胜邦的所有重要数据备份在2007年第三季度之前都会存储在Date Center中,所以可以很容易做数据恢复。 | 国际程控电话和传真 | 2个IDAP线路和4个普通线路由当地电信服务商提供 | 5个工作日可以完成电话线路恢复工作,在这段时间内可以使用移动电话在安排工作, 移动电话的email服务和拨号上网服务可以在2个工作日内完成 |
|
作者: 山野 时间: 2006-10-26 22:33
我还不会插入表格呢
怎么弄的啊
作者: 阿军 时间: 2006-10-26 23:16
我做了一个使用表格的介绍
,山野mm可以去看看 
作者: yankeyu 时间: 2006-10-27 08:49
引用第35楼俺比较丑于2006-10-26 23:16发表的“”: 我做了一个使用表格的介绍
,山野mm可以去看看 
兄弟真牛!!!!
作者: temboard 时间: 2006-10-29 14:27
建議
individual air conditioners
譯為 獨立空調機
storage tank
譯為 儲氣槽 或是 儲氣缸
| 欢迎光临 单车之家-BikeHome.net (http://bbs.bikehome.net/) |
Powered by Discuz! X3.2 |